Synthesis Gas & Derivatives

IHI E&C has been involved in numerous projects utilizing various Fischer-Tropsch (FT) technologies for coal-to-liquids (CTL), gas-to-liquids (GTL) and biomass-to-liquids (BTL) plants, with capacities ranging from 300 barrels per day to 20,000 barrels per day. In addition to FT plants, IHI E&C has extensive design and construction experience in upstream units such as synthesis gas and synthesis gas processing. IHI designed and constructed a test facility for BP Exploration Inc. in Alaska where natural gas was converted to produce 300 barrels per day of syncrude utilizing a novel synthesis gas production technology named “Compact Reforming.”
.

For FT project profile go to: BP Alaska project

All Projects
Chemicals, Petrochemicals & Polymers
Gas Processing & LNG
Refining
Synthesis Gas & Derivatives
  • Gulf LNG - Receiving, Storage and Regasification
    anemptytextlline
  • Snøhvit LNG Export Terminal
    anemptytextlline
  • Adriatic LNG Terminal, Offshore LNG Receiving, Storage, and Regasification
    anemptytextlline
  • Integrated Dez Gas Project
    anemptytextlline
  • Eunice Gas Processing and NGL Fractionation Plant Expansion
    anemptytextlline
  • PGU Project - Gas Processing Plants 5 & 6
    anemptytextlline
  • Methanol Plant (Train II &III)
    anemptytextlline
  • Gas to Liquids (GTL) Test Facility
    anemptytextlline
  • Industrial Gasification and Liquefaction Plant
    anemptytextlline
  • Ethylene Vinyl Alcohol (EVOH) Third Line Expansion
    anemptytextlline
  • Methyl Tertiary Butyl Ether (MTBE) Complex
    anemptytextlline
  • Bayer Corporation Bisphenol-A (BPA) Project
    anemptytextlline
  • Maatschappij Suriname N.V. Refinery Expansion
    anemptytextlline
  • Hydrogen Compression Project
    anemptytextlline
  • Elba Island, LNG, Elba Liquefaction Project
    Elba Island LNG Liquefaction Terminal
    anemptytextlline