Our Projects

All Projects
Gas Processing & LNG
Synthesis Gas & Derivatives
Chemicals, Petrochemicals & Polymers
Refining
  • Elba Island, LNG, Elba Liquefaction Project
    April 19, 2016
    Elba LNG Liquefaction Terminal
    Read More
  • October 17, 2015
    Hydrogen Compression Project
    Read More
  • October 17, 2015
    Maatschappij Suriname N.V. Refinery Expansion
    Read More
  • October 17, 2015
    Bayer Corporation Bisphenol-A (BPA) Project
    Read More
  • October 17, 2015
    Methyl Tertiary Butyl Ether (MTBE) Complex
    Read More
  • October 17, 2015
    Ethylene Vinyl Alcohol (EVOH) Third Line Expansion
    Read More
  • October 17, 2015
    Industrial Gasification and Liquefaction Plant
    Read More
  • October 17, 2015
    Gas to Liquids (GTL) Test Facility
    Read More
  • October 17, 2015
    Methanol Plant (Train II &III)
    Read More
  • October 17, 2015
    PGU Project - Gas Processing Plants 5 & 6
    Read More
  • October 17, 2015
    Eunice Gas Processing and NGL Fractionation Plant Expansion
    Read More
  • October 17, 2015
    Integrated Dez Gas Project
    Read More
  • October 17, 2015
    Adriatic LNG Terminal, Offshore LNG Receiving, Storage, and Regasification
    Read More
  • October 17, 2015
    Snøhvit LNG Export Terminal
    Read More
  • March 4, 2015
    Gulf LNG - Receiving, Storage and Regasification
    Read More
  • Elba Island, LNG, Elba Liquefaction Project

    Elba LNG Liquefaction Terminal

    IHI E&C was awarded a contract for the engineering, procurement, construction, commissioning and startup of Kinder Morgan’s natural gas liquefaction project at Elba Island, near Savannah, Georgia. The Elba Liquefaction Project will consist of 10 Movable Modular Liquefaction System (MMLS) trains using Shell proprietary technology. The new units will connect to Kinder Morgan’s existing re-gasification terminal […]

  • 540-MW Combustion Turbine Combined-Cycle Power Plant

    The plant uses two Siemens-Westinghouse W501F combustion turbine generators (CTGs), Nooter/Eriksen heat recovery steam generators and a Siemens-Westinghouse steam turbine. We provided construction and procurement of bulk material, including 30,000 cubic yards of concrete, 3,800 tons of steel, 115,000 linear feet (Lft) of pipe and 1,100,000 Lft of wire and cable.   To accomplish plant […]

  • 164-MW Natural Gas-Fired Turbine (GTG) Generator and Heat Recovery Steam Generator (HRSG)

    We provided all detailed engineering, major procurement and construction (EPC).The new GTG has a nominal power production of 164 MW at the site-average ambient air temperature. The HRSG produces about 560 K lb/hr of 1,500-psig steam, operating unfired.  We prepared for the future installation of duct burners in the HRSG to allow supplemental firing resulting […]

  • Progress Energy Electrostatic Precipitator (ESP) Rebuild

    We provided construction direct hire and subcontract labor for the rebuild of two ESPs for the coal-fired power plant.To construct three new fields in the direction of gas flow for the ESPs, we modified each with a new roof-mounted magnetic impulse gravity impact (MIGI), rigid discharge electrode (RDE) and collecting electrode (CE) rapper system.   […]

  • Minera San Cristóbal (MSC) Apex Silver Mines Corporation San Cristóbal Project in the Potosí Department of Southern Bolivia

    Initially, we completed a Bankable Feasibility Study for the project . We provided detailed engineering, procurement and constructionfor a large-scale, open-pit mine and a conventional concentrator capable of processing 40,000 t/d of ore. Processing includes primary crushing, semi-autogenous grinding (SAG) and ball milling, and differential flotation to produce separate concentrates of lead and zinc, each […]

  • 1

    Hydrogen Compression Project

    IHI E&C participated in a brownfield project with tie-ins to the existing refinery to add a hydrogen compressor to recycle reformer offgas to hydrocracker.     Highlights: Committed to 24-month project during extremely busy market place period (2007 to 2009) Performed FEED in integrated team with BP Supported engineering and procurement (EP)

  • Staatsolie-pic1

    Maatschappij Suriname N.V. Refinery Expansion

    The goal of the project is to increase the refinery capacity at the Tout LuiFaut refinery from 7,000 to 15,000 barrels per day. The present refinery consists of a Vacuum Distillation Unit and a Visbreaker Unit, which produce mainly diesel and fuel oil. When complete, the project will be fully integrated with the adjacent existing […]

  • 2

    Bayer Corporation Bisphenol-A (BPA) Project

    IHI E&C provided EPC services for a 160,000 MTPY facility. Engineering and construction were performed on a lump sum basis; equipment and materials procurement was reimbursable.     Highlights: Scope required 1.3 million man hours

  • Coastal Chem MTBE

    Methyl Tertiary Butyl Ether (MTBE) Complex

    IHI E&C provided basic design and EPC and assisted with plant commissioning and startup of the first fully integrated and most cost-effective MTBE complex in the world when constructed in 1992.     Highlights: Initiated commercial application of the then Phillips Company Steam Active Reforming (STAR) dehydrogenation process This first of a kind facility integrated […]

  • 1

    Ethylene Vinyl Alcohol (EVOH) Third Line Expansion

    IHI E&C provided EVALCA with project definition, basic and detailed design, completing the project on time in two distinct phases. An early Phase I completion allowed a successful shutdown and turnaround.     Highlights: Total rework quantified at 2.3% compared to industry average of 8 to 12% Awarded EVALCA Safety Achievement Award for: 500,000 safe […]